Ein AlSultan Irrigation Rehabilitation Project

Name of Employer:
Jericho Municipality
Duration:
40 months
Date of Completion:
August, 2008
Location:
Jericho , Palestine
Sector:
Water and Wastewater Networks

Construction of UPVC water network and HDPE Irrigation network.

Construction of Hydrometer, water meter, mechanical hydrants, valves, mechanical assembly, resetting and operation mode of irrigation pumps and modification of electrical float level control of the irrigation pumps.

Developed By BlueRay for Web Solutions | All Rights Reserved © 2024 Gama Engineering and Contracting Establishment